Large wood load and transport in a flood-free period within an inter-dam reach: a decade of monitoring the Dyje River, Czech Republic

Warning

This publication doesn't include Faculty of Arts. It includes Faculty of Science. Official publication website can be found on muni.cz.
Authors

MÁČKA Zdeněk KINC Ondřej HLAVŇA Matej HORTVÍK David KREJČÍ Lukáš MATULOVÁ Jana COUFAL Pavel ZAHRADNÍČEK Pavel

Year of publication 2020
Type Article in Periodical
Magazine / Source Earth Surface Processes and Landforms
MU Faculty or unit

Faculty of Science

Citation
web https://doi.org/10.1002/esp.4985
Doi http://dx.doi.org/10.1002/esp.4985
Keywords large wood; spatiotemporal variability; transport; water reservoir; wood tagging; the Dyje River
Description This study examined the large wood (LW) load and transport during the non-flood period (2009-2018) following major floods that occurred in 2002 and 2006 within the inter-dam reach of the Dyje River (Czech-Austrian border). The LW load was examined in 36 river corridor segments scattered within the reach in the 2009-2018 period. Two whole-reach surveys (2011 and 2019) on LW frequency and distribution were conducted, and the export of LW to the downstream reservoir was analysed between June 2013 and December 2018. In the period of non-flood discharges, the recruitment and depletion of LW were highly variable processes in space and time, leading to a considerable change in the total LW quantity. Whereas the total number of LW pieces decreased, the total LW volume increased because of the increasing dimensions of newly recruited pieces. The annual variability in the quantity of newly recruited pieces was better explained by the variation in the maximum annual discharges (y= 41.043ln(x) + 3.2737,R-2= 0.5352) than by the variability in the number of days with wind gusts >17.2 m/s (y= 1.5004x+ 82.096,R-2= 0.118). The land use change with the abandonment of human settlements after World War II and the progressive expansion of forest was the major historical factor driving the increased recruitment of LW to the river corridor. While the 2006 (>100-year RI) flood brought approximately 1,250 LW pieces to the reservoir, the 2013 (1.5-year RI) flood delivered 45 pieces. The long-term average monthly input of LW to the reservoir was 7.7 pieces. The exceptional low-magnitude flood of 2013, which occurred at the beginning of the monitoring period, was shown to be a threshold above which the number of LW pieces that floated to the dam significantly increased.
Related projects:

You are running an old browser version. We recommend updating your browser to its latest version.